Skip to main content

Tailings Timeline

Oil sands mine development, and the tailings that result from it, have a progressive history in Alberta. We continue to work with industry, other stakeholders, and Albertans to find innovative ways to reduce tailings growth.

Here are some key events and publications over the last 30 years that have promoted innovation in tailings management—and still do.

Timeline

Pond 1 Suncor

1967 - First Oil Sands Tailings Pond

Great Canadian Oil Sands (now Suncor) started construction of the first oil sand tailings pond (pond 1).

1974 - Alberta Oil Sands Technology and Research Authority established

Premier Peter Lougheed initiated Alberta Oil Sands Technology and Research Authority as a Crown corporation.

Tailings Fundamental Consortium developed

1989 - Fine Tailings Fundamental Consortium established

The Fine Tailings Fundamental Consortium is established to provide scientific understanding of fine tailings. The Government of Alberta and industry get together to share information on fluid tailings and the technologies to treat and reclaim them.

1995 - Advances in Oil Sands Tailings Research published

A comprehensive report reviewing oil sands tailings science and treatment technologies—Advances in Oil Sands Tailings Research —is published by the Government of Alberta.

The report is a culmination of six years of research by the oil sands industry and the Government of Alberta. It identifies the technology of adding gypsum to tailings sand and mature fine tailings to change the mature fine tailings from a fluid to a solid. The resulting “clumps” make it easier to separate clay from the water.

1996 - Suncor successfully separates water and clay on a large scale

Suncor begins using the technology identified in Advances in Oil Sands Tailings Research and successfully separates water and clay on a large scale.

Image Credit: Pond 1, photo courtesy of Suncor Energy Inc.

2000 - Syncrude starts using same technology

Syncrude starts using the same technology identified in Advances in Oil Sands Tailings Research and experiences similar success in separating clay and water.

2009 - The AER releases Directive 074: Tailings Performance Criteria and Requirements for Oil Sands Mining Schemes

This (former) AER directive set out new requirements for the regulation of tailings operations associated with mineable oil sands. The directive specified performance criteria for the reduction of fluid tailings.

2010 - Suncor thin-lift evaporative drying

Suncor applies a technology known as thin-lift evaporative drying, which was developed through laboratory research and field testing, on a large scale. By adding polymer to tailings, the fine solids and clay particles form together. The mixture is spread across a shallow pond and, once the clumps settle, most of the water can be recycled. Any remaining water evaporates within 21 days.

Image Credit: Courtesy of Shell Canada Limited

2010 - Suncor Wapisiw Lookout (Pond 1) reclamation

Suncor reclaims its first tailings pond at Wapisiw Lookout. Mature fine tailings were removed over ten years. The pond was filled in with tailings sands and capped with reclamation material, and then trees and grasses were planted on top.

Image Credit: Wapisiw Lookout photo courtesy of Suncor Energy Inc.

2010 - Shell atmospheric fines drying

Shell tests a type of thin-lift evaporative drying technology at its Muskeg River Mine site.

2012 - Accelerated dewatering field trial – polymer flocculation

Syncrude tests a new technology, polymer flocculation. This process aims to remove water from mature fine tailings in a deep pit. A polymer is added to bring the fine solids and clay particles together in clumps. Water is removed through a central sump and a ditch is dug around the pit.

Image Credit: Courtesy of Syncrude Canada Limited 

2012 - Centrifuge commercial demonstration

Syncrude tests large-capacity centrifuges to remove water from a polymer and tailings mixture. The dewatered product is trucked to a shallow containment area where it is spread about a metre thick. The remaining water then evaporates.

Image Credit: Courtesy of Shell Canada Limited

2012 - Base Mine Lake full-scale demonstration of water capping

About 200 million cubic metres of mature fine tailings are placed in a mined-out pit in Syncrude's base mine area and topped with 5 metres of water to determine whether the lake could reach a reclamation state by natural processes and eventually be connected to the surface water system.

The Alberta Energy Regulator is established

2013 - Alberta Energy Regulator is established

Alberta Energy Regulator is created with full energy regulatory functions for all enactments related to public lands, water, and the environment for all energy-related developments previously held by Alberta Environment and Protected Areas (formerly Alberta Environment and Sustainable Resource Development).

The report is a culmination of six years of research by the oil sands industry and the Government of Alberta. It identifies the technology of adding gypsum to tailings sand and mature fine tailings to change the mature fine tailings from a fluid to a solid. The resulting “clumps” make it easier to separate clay from the water.

2014 - Field demonstration of overburden and mature-fine-tailings mixing

Mature fine tailings are mixed with dry overburden rich in clay to absorb the water. Overburden is the material removed from above an oil sands formation and is typically 50 metres thick.

2015 - Commercial thickeners

Canadian Natural Resources Ltd. and Imperial Oil start building commercial thickeners. Thickeners are being used commercially for water removal from fluid tailings in other mining operations worldwide.

Tailings Management Framework

2015 - Tailings Management Framework

The Government of Alberta’s new Tailings Management Framework provides direction to the AER and industry on how to manage fluid tailings volumes. It represents an evolution in how industry, the regulator, and the government manage fluid tailings accumulation and risk. It promotes technological innovation, understanding, and certainty around tailings treatment options to ensure fluid tailings volumes are managed into the future.

2015 - Tailings Management Reporting

The first State of Fluid Tailings Management for Mineable Oil Sands report published.

2016 - The AER replaces Directive 074 with Directive 085: Fluid Tailings Management for Oil Sands Mining Project

The new tailings directive uses the overall volume of fluid tailings to track reduction. The new requirements are an evolution in how industry, the AER, and government will manage tailings. It tackles existing fluid tailings and new fluid tailings growth. 

2017 - The AER updates Directive 085 and begins making decisions on industry tailings management plans

The tailings directive is updated as part of a phased-approach to clarify the AER’s requirements to manage fluid tailings through performance reporting and enforcement. The AER also begins making decisions on tailings management plans under Directive 085.

2019 - Tailings Management Plans

All eight oil sands operators have approved tailings management plans (TMPs) in place. See the Tailings Notices and Decisions webpage.